Büchi Labortechnik AG
Operating top-mount drying racks | 8
Operation Manual Lyovapor™ L-200/L-200 Pro
81/100
u
Place the seal on the connection.
u
Fit the manifold drying rack onto the seal and
fix it with the clamp.
u
Carry out freeze-drying.
8.7
Operating manifold valves
The lever on a manifold valve can be set to the following positions:
1
2
A
B
Position
Function
A: Lever pointing up
The connected vessel is evacuated.
B: Lever pointing down The connected vessel is vented.