8 | Operating top-mount drying racks
Büchi Labortechnik AG
70/100
Operation Manual Lyovapor™ L-200/L-200 Pro
u
Align the slots for the shelves.
u
Tighten the fixing screws.
u
Place the rack on the intermediate plate.
u
Slide the shelves into the rack.
u
Press the plug onto the shelf connection and
turn the ring counterclockwise at the same
time.