8 | Operating top-mount drying racks
Büchi Labortechnik AG
76/100
Operation Manual Lyovapor™ L-200/L-200 Pro
u
Check the O-ring for damage.
u
Place the O-ring into the groove of the cover.
u
Place the manifold cover on the cylinder.
u
Carry out freeze-drying.
8.4
Operating acrylic drying chamber (heatable shelf)
u
Make sure that the groove above the ice
condenser is clean, free of dust and not
scratched.
u
Check the 300 mm dia. O-ring for damage.
u
Place the 300 mm dia. O-ring in the groove
above the ice condenser.
u
Place the intermediate plate on the ice
condenser.