
Büchi Labortechnik AG
Installation | 5
Operation Manual Lyovapor™ L-200/L-200 Pro
27/100
u
Fit the pressure-regulating valve onto the 90°
elbow.
u
Fit the assembled advance vacuum control unit
onto the instrument.
u
Plug the aeration valve connector into the
socket marked Aeration Valve.
u
Plug the pressure-regulating valve connector
into the socket marked Regulation valve.
u
Plug the main valve connector into the socket
marked Main Valve.
5.3.4
Manual switch on the main valve
Use the main valve manual switch to set the vacuum control mode.