Fig. 26—End Of Normal Sequence Of Operation
A00316
GAS VALVE AND CIRCULATOR PUMP ARE
DE-ENERGIZED. VALVE LIGHT GOES OUT.
DRAFT INDUCER RUNS FOR 30 SECOND
POSTPURGE. PURGE LIGHT ON.
DRAFT INDUCER IS DE-ENERGIZED AFTER
30 SECONDS. PURGE LIGHT SHUTS OFF.
THERMOSTAT ENDS CALL FOR HEAT.
BOILER STANDS BY FOR NEXT CALL FOR HEAT
END OF NORMAL SEQUENCE OF OPERATION
DETAILED SEQUENCE OF OPERATION
—34—
Summary of Contents for BW9
Page 37: ...Fig 29 Troubleshooting Chart No 1 A00318 37 ...
Page 39: ...Fig 31 Troubleshooting Chart No 3 A00319 39 ...
Page 40: ...Fig 32 Troubleshooting Chart No 4 A00320 40 ...
Page 41: ...Fig 33 Troubleshooting Chart No 5 A00321 41 ...
Page 42: ...Fig 34 Troubleshooting Chart No 6 A00322 42 ...
Page 46: ...Fig 38 Boiler Block and Piping Assembly A99176 46 ...
Page 51: ... 51 ...
Page 52: ... 2003 CAC BDP 7310 W Morris St Indianapolis IN 46231 imbw9a03 52 Catalog No 63BW 9A4 ...