B.
Install Your Thermostat
The thermostat location has an important effect on the operation of your boiler system. BE SURE TO FOLLOW THE INSTRUCTIONS
INCLUDED WITH YOUR THERMOSTAT.
Locate the thermostat about 5 ft above the floor on an inside wall. It may be mounted directly on the wall or on a vertical mounted outlet box.
It should be sensing average room temperature. Avoid the following:
DEAD SPOTS: behind doors corners and alcoves.
HOT SPOTS: concealed pipes, fireplaces, TV sets, radios, lamps, direct sunlight, and kitchens.
COLD SPOTS: concealed pipes or ducts, unheated rooms on other side of wall, and stairwells - drafts.
Set heat anticipator at 0.7 amps. Connect 24 volt thermostat leads to the 2 yellow wires located in service switch junction box, located on outer
jacket of boiler. See Fig. 17 for service switch junction box and thermostat field wiring connections.
C.
Connect Circulator Pump Wiring
See Fig. 17 for service switch junction box and circulator pump field wiring connections. A 5 ft wiring harness with flexible metal conduit is
supplied to connect the circulator pump to the service switch junction box. If the two 120 volt circulator wire terminals inside the junction box
are not used, please leave the 2 wire nuts installed on black and white leads to prevent the short circuit.
CAUTION: Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and
dangerous operation. Verify proper operation after servicing.
PROCEDURE 8—CONTROLS AND ACCESSORIES
This section provides a brief description of the key controls and accessories found in the BW9 boiler.
See the Troubleshooting section of the Service Hints chapter of this installation manual for detailed sequences of operation and troubleshooting
procedures. See the Repair Parts chapter of this manual for locations of all control components and accessories described.
A.
Intergrated Boiler Control (IBC)
The Integrated Boiler Control (IBC) is a microprocessor based controller for a high efficiency gas boiler that monitors all safety controls and which
controls the operation of the combustion air blower, circulator pump, burner, and a combination hot surface igniter/flame sensor. This controller
is not intended for use with a vent damper. This controller is mounted on the control panel inside of the boiler and contains 5 diagnostic indicator
lights.
B.
Gas Control Valve
The electrically controlled 24 Volt Honeywell Model VR8205 Combination Gas Control Valve is designed to meet the requirements for use with
hot surface ignition systems found in the BW9. The valve is piped to the gas/air mixer.
C.
Hot Surface Igniter
The 120 volt Hot Surface Igniter heats up to 1800°F to initiate combustion of the gas in the BW9 burner. The igniter is mounted next to the burner
through the gas/air mixer. The igniter also serves as a means for proving the main burner flame by flame rectification. In the event of a lack of
flame signal on 3 consecutive trials for ignition, the IBC will lockout. The
″
VALVE
″
diagnostic indicator lamp (lamp
″
D
″
on the IBC, See Fig.
21) will blink indicating the failure mode as a lack of flame signal. The IBC is manually reset from lockout by either removing and reestablishing
the thermostat’s call for heat, or by turning the service switch off, then back on.
Table 7—Gas Pipe Size
NATURAL GAS
Length of Pipe — Ft.
Pipe Capacity — Btuh Input (Includes Fittings)
1/2 in.*
3/4 in.*
1 in.
1–1/4 in.
20
92,000
190,000
350,000
625,000
40
63,000
130,000
245,000
445,000
60
50,000
105,000
195,000
365,000
PROPANE GAS
Length of Pipe — Ft.
Copper Tubing
Iron Pipe
5/8 in.*
3/4 in*
1/2 in.*
3/4 in.*
20
131,000
216,000
189,000
393,000
40
90,000
145,000
129,000
267,000
60
72,000
121,000
103,000
217,000
* Outside diameter
Table 8—BW9 Gas Supply Pressures
NATURAL
PROPANE
Maximum Gas Supply Pressure
10-in. w.c.
14-in. w.c.
Recommended Gas Supply Pressure
7-in. w.c.
11-in. w.c.
Minimum Gas Supply Pressure
5-in. w.c.
10-in. w.c.
—19—
→
Summary of Contents for BW9
Page 37: ...Fig 29 Troubleshooting Chart No 1 A00318 37 ...
Page 39: ...Fig 31 Troubleshooting Chart No 3 A00319 39 ...
Page 40: ...Fig 32 Troubleshooting Chart No 4 A00320 40 ...
Page 41: ...Fig 33 Troubleshooting Chart No 5 A00321 41 ...
Page 42: ...Fig 34 Troubleshooting Chart No 6 A00322 42 ...
Page 46: ...Fig 38 Boiler Block and Piping Assembly A99176 46 ...
Page 51: ... 51 ...
Page 52: ... 2003 CAC BDP 7310 W Morris St Indianapolis IN 46231 imbw9a03 52 Catalog No 63BW 9A4 ...