![BRUSTOR B500 Mounting Instructions Download Page 5](http://html.mh-extra.com/html/brustor/b500/b500_mounting-instructions_2821465005.webp)
OL-B500-03
2. PLACING THE VERTICAL POLES
› Take the pole supports out of the vertical poles, also remove the pre-assembled zip guides and the corner reinforcement e
(1).
› Fix the pole supports or the floor plates on the ground.
› Check the dimensions on the previous page again before fixing the bolts.
› Then slide the vertical pole (possibly provided with screen guides) on top.
› Make sure that the pole is perpendicular.
› Level any unevenness.
› Note the difference between a pole where a screen will be fitted to the side (2) and where no side screen will be fitted (3).
› Place the poles as shown below.
Pole support
Floor plate 20x20cm
Ground anchor
1
Vertical pole
Vertical pole
without side screen
Vertical pole
with side screen
Door pole against the well
2
3
› Place a drain in post E2 and E3 (poles at the front).
Rollertube octo
W1
L2
L1
Door pole against wall
Only in case of side screen
Vertical pole
Drain
Vertical pole
Drain
Door pole against wall
Only in case of side screen
E4
E3
E2
E1
7-7/8” x 7-7/8”