OL-B500-18
11. ADJUSTING THE ENDPOINTS
1
2
› With a number of screens and folding fabric motor:
› Connect one of the screens to the main voltage (220V).
› Fully program this motor up to and including the allocation of the transmitter.
› Cut of the power to the motor!
› Now do the same with the other motors, connect them one by one and each time cut off the power.
› When all motors have been programmed, connect them all to the main voltage again. (220V).
REGLAGE DU MOTEUR ALTUS RTS
REGLAGE DU MOTEUR ALTUS RTS
› Set the folding fabric so the first flowprofile passes over the gutter on the W1 side(1)
› Sliding the last flowprofile backwards will put more tension on the fabric. (2)
› Sliding the last fabric profile forwards allow the leadrail to pass further over the gutter.(2)