Technical data
and startup
42
If HV voltage > 100 V, the wiring system is loaded with </= 30 mA.
8.3.3
Pin 3 EN (Enable, Power ON)
INFORMATION
To program new firmware, pin 3 must be
high
!
Internal wiring
9
5
n
F
Pin 3
EN
48V
4
7
u
F
+5V
4,7K
4
,7
K
100
n
5V
6
KL30
10
K
KL15
INT
ISU
FLT
If voltage is applied at pin 2 and pin 3 =
high
, this effects the start-up of the controller. Communication with the
inverter is thereby enabled. If additional HV voltage is applied, this effects the activation of
Ready
mode.
The internal device logic is only fed if pin 3 =
high
. This is also the case if HV+ and HV- are already applied in high
voltage. Pin 3 has the function of terminal 15.
8.3.4
Pin 8 PG1, 14 PG2, 15 PG3 (Reserve ground, RS232 ground)
INFORMATION
The additional ground connections are intended to simplify the external wiring.
Internal wiring
4
7
0
p
F
Pin 8
PG1
Pin 14
PG2
Pin 15
PG3
7
5
0
m
A
The pins 8, 14 and 15 are each connected with pin 1
GND
via a reversible fuse (PTC) and are thereby protected.
The following allocation is recommended:
Pin 8: Reserve
Pin 14: CAN-GND
Pin 15: 9 pole D-Sub: Pin 5