CRUSH WARNING!
Do not attempt to lift the I-26/26R by hand.
Always use a lifter or other suitable equipment when raising or handling
the unit.
4.1
Tools Required for Installation
To install the I-26/26R on an optional base and/or to stack I-26/26R units, the following
tools will be needed:
•
Number 2 Phillips head screwdriver
•
Level,
≥
10-inch (25.4 cm)
•
Two adjustable wrenches
•
Forklift or other lifting equipment to lift more than 370 lbs (168 kg)
•
Metal leveling shims
4.2
Leveling a Single Shaker
NOTE:
Do NOT use feet if you are stacking shakers or adding a base.
Make sure that the shaker is placed on a level surface and that all four feet are solidly on
the surface. If the shaker is not level, adjust the feet as needed to achieve leveling:
1. Immobilize the top lock nut against the unit with one wrench
whenever you adjust
the foot
, to keep the threaded stud from falling out.
Figure 2: Adjustable Foot
BOTTOM
OF UNIT
LOCK NUT
FLATS FOR WRENCH
FOOT