136 (167)
BRUKER
Installation Manual Version 001
Sample Heater Option
Connectors on the PK100 Supply Module
13.2.2
Adjusting the PK240
13.2.3
ADJUSTMENT OF THE OVER VOLTAGE PROTECTION (OVP)
To adjust the OVP the sense lines must be connected over a 100
Ω
/
10
Watt Re-
sistor and the over voltage protection measured directly on the output voltage
connector or on the front-panel connector named TEST.
Adjust the OVP using the external pot on the front panel of the Power Supply,
named OVP
adj
.
Here the OVP = 30V.
ADJUSTMENT OF THE OUTPUT VOLTAGE (Vout)
Connect the +Sense (Pin G) to the +UA (Pin A) and the -Sense (Pin E) to the -UA
(Pin C) on the Burndy Connector located on rear panel power supply.
Adjust the output voltage using the external pot on the front panel of the Power
Supply, named V
adj
.
Here the UA = 26V.
➪
Do not shorten the sense lines, as this may cause damage to the power sup-
ply.
➪
This adjustment is normally not required as the unit has already been cor-
rectly set by the manufacturer.
Table 13.3.
H15 connector
PIN
FUNCTION
4,6
+UA
12,14
-UA
10
-Sensor
8
+Sensor
24
230VAC
26
230VAC Phase
32
Protected Earth
Summary of Contents for B-ACS 120
Page 1: ...BRUKER Version Bruker Automated Control Systems B ACS 60 120 Installation Manual 001...
Page 7: ...Installation Manual Version 001 BRUKER 7 167 1 Declaration of Conformity 1...
Page 10: ...10 167 BRUKER Installation Manual Version 001 Introduction...
Page 40: ...40 167 BRUKER Installation Manual Version 001 Operating Instructions...
Page 56: ...56 167 BRUKER Installation Manual Version 001 Special Tools...
Page 60: ...60 167 BRUKER Installation Manual Version 001 Technical Data...
Page 150: ...150 167 BRUKER Installation Manual Version 001...
Page 160: ...160 167 BRUKER Installation Manual Version 001 Figures...
Page 167: ...Installation Manual Version 001 BRUKER 167 167 Lastpage...