
6-14
Modem error details (Code 3)
Code 3
Causes
21
Timeout waiting for INFO0.
22
Checksum error in INFO0.
23
Timeout waiting for tone A or B.
24
Timeout waiting for first phase reverse.
25
Timeout waiting for probing cut-off tone.
26
Timeout waiting for second phase reverse.
27
Timeout waiting for end of probing.
28
Timeout waiting for third phase reverse.
29
Timeout waiting for INFO1.
2A
Checksum error in INFO1.
2B
Tone detected preceding INFO0.
2C
Unexpected INFO0 detected.
31
Timeout waiting for turning off the receive control channel.
91
Error occurred in the first CC train.
92
Timeout waiting for PPh.
93
Tone A/B detected in the CC retrain.
94
Timeout waiting for ALT.
95
ACh found.
96
FED turned off during reception of CC data.
97
Timeout waiting for turning off the CC.
A1
Retraining forced for problems not fixed in phase 2.
B0
Problem with S-sequence of HDX-resync.
B1
FED turned off in the S-sequence of HDX-resync.
B2
S-sequence finished before prediction in HDX-resync.
B3
Timeout waiting for S-Sbar in HDX-resync.
B4
Timeout waiting for S-Sbar in HDX-resync.
B5
Timeout waiting for S in HDX-resync.
B6
Timeout waiting for synchronization with PP.
C0
Problem with S-sequence in phase 3.
C1
FED turned off in the S-sequence in phase 3.
Summary of Contents for DCP-1000
Page 1: ...Multi Function Machine SERVICE MANUAL MODEL MFC6800 DCP1000 MFC9180 MFC9160 ...
Page 5: ...CHAPTER 1 GENERAL DESCRIPTION ...
Page 12: ...CHAPTER 2 INSTALLATION ...
Page 17: ...CHAPTER 3 THEORY OF OPERATION ...
Page 19: ...3 1 3 1 OVERVIEW Provided on models supporting facsimile function ...
Page 21: ...3 3 ...
Page 29: ...3 11 Location of Sensors and Actuators ...
Page 31: ...CHAPTER 4 DISASSEMBLY REASSEMBLY AND LUBRICATION ...
Page 38: ...4 5 n Disassembly Order Flow ...
Page 70: ...4 37 6 Turn the ASF upside down then remove the registration sensor actuator ...
Page 78: ...4 45 Setting up the main PCB after replacement ...
Page 104: ...CHAPTER 5 MAINTENANCE MODE ...
Page 111: ...5 6 Scanning Compensation Data List ...
Page 119: ...5 13 For machines w fax For machines w o fax Key Button Entry Order ...
Page 126: ...CHAPTER 6 ERROR INDICATION AND TROUBLESHOOTING ...
Page 156: ...MFC6800 DCP1000 MFC9180 MFC9160 Appendix 1 EEPROM Customizing Codes ...
Page 159: ...MFC6800 DCP1000 MFC9180 MFC9160 Appendix 2 Firmware Switches WSW ...
Page 206: ...A Main PCB 1 5 ...
Page 207: ...A Main PCB 2 5 ...
Page 208: ...A Main PCB 3 5 ...
Page 209: ...A Main PCB 4 5 ...
Page 210: ...A Main PCB 5 5 ...
Page 211: ...B NCU PCB U S A Canada ...
Page 212: ...B NCU PCB U K Norway Netherlands Finland Denmark Sweden ...
Page 213: ...B NCU PCB Germany France Belgium Switzerland Ireland Austria Spain Italy South Africa ...
Page 214: ...B NCU PCB Asia Oceania 1 2 ...
Page 216: ...C Control Panel PCB ...
Page 217: ...D Power Supply PCB 100 120V Low voltage power supply ...
Page 218: ...D Power Supply PCB 200 240V Low voltage power supply Europe ...
Page 219: ...D Power Supply PCB 200 240V Low voltage power supply Asia Oceania ...
Page 220: ...D Power Supply PCB High voltage power supply ...
Page 221: ...E Relay PCB ...