2-4
9. Crane may tip at less than rated loads if the surface is uncompacted or wet dirt, or soft soil
with frozen crust, thin or cracked pavement, or surface near a hole or ledge. Always use
adequate outrigger floats and/or cribbing. See page 2-15.
10.The operator shall not leave the controls while the load is suspended.
11. Always use adequate parts of load hoist line for lifting heavy loads.
12. Always be sure the rope is properly seated and wound evenly on hoist drum.
13. Keep hands away from load hoist rope when hoist is being operated.
14. Be sure at least three wraps of rope are left on the hoist drum to ensure against rope pulling
out of its anchor.
15. Never wrap the hoist rope around a load. Always use approved rigging.
16. Avoid pinch points such as between a rotating turret and the cab, or in access holes of a
telescoping boom, or between the two-block mechanism.
Summary of Contents for IC-250-3D
Page 6: ...1 2 IC 250 3D DIMENSIONS...
Page 7: ...1 3 IC 250 3D TURNING DIMENSIONS...
Page 16: ......
Page 30: ...2 14...
Page 42: ......
Page 51: ...3 9 IC 250 3D LUBRICATION CHART...
Page 58: ...3 16...
Page 59: ...3 17...
Page 68: ...3 26 BOOM CHAIN ADJUSTMENT...
Page 73: ......