TABLE OF CONTENTS
SECTION 1 DESCRIPTION AND SPECIFICATIONS
Introduction…………………………………………………………………
1-1
IC-250-3D Dimensions……………………………………………………. 1-2
Turning Dimensions……………………………………………………….
1-3
Description and Specification…………………………………………….
1-4
SECTION 2 OPERATION
Safety Rules………………………………………………………………..
2-1
Crane Conditions………………………………………………
2-1
Lifting……………………………………………………………
2-3
Travel……………………………………………………………
2-7
Instruments and Controls…………………………………………………
2-8
Control Functions………………………………………………
2-9
Four-Wheel Steer operation………………………………….
2-9
Sequence of Operation……………………………………………………
2-10
Driving the Vehicle……………………………………………..
2-10
Operating the Crane…………………………………………..
2-10
Normal Gauge Reading……………………………………….
2-10
Rated Capacity Limiter………………..………………………
2-11
Crane Capacity…………………...……………..……………………...…
2-12
Crane Capacity Chart IC-250-3D…………………………….
2-14
Capacity Example……………………………………………..
2-15
Sheave Block and Downhaul Weight…………………………………….
2-16
Two-Part Line Reaving…………………………………………………….
2-17
Four-Part Line Reaving……………………………………………………
2-17
Safety Devices……………………………………………………………..
2-18
Outrigger Check Valve………………………………………..
2-18
Boom Cylinder Holding Valve…………………………………
2-18
Telescope Cylinder Holding Valve……………………………
2-18
Hoist Brake and Holding Valve……...…………………………
2-18
Anti-Two-Block System………………………………………..
2-18
Optional Equipment………………………………………………………..
2-19
Installing and Stowing Boom Extension……………………..
2-19
Setting the Angle on the Offsettable Boom Extension....…..
2-20
Capacity Example for Boom Extension………………………
2-21
Front Auxiliary Winch………..……….………………………..
2-22
Pintle Hooks...……………..…………………………………..
2-23
Switch and Indicator Symbols……………………………………………..
2-24
Summary of Contents for IC-250-3D
Page 6: ...1 2 IC 250 3D DIMENSIONS...
Page 7: ...1 3 IC 250 3D TURNING DIMENSIONS...
Page 16: ......
Page 30: ...2 14...
Page 42: ......
Page 51: ...3 9 IC 250 3D LUBRICATION CHART...
Page 58: ...3 16...
Page 59: ...3 17...
Page 68: ...3 26 BOOM CHAIN ADJUSTMENT...
Page 73: ......