3-7
500 HOUR OR 6 MONTH INTERVAL:
1. 250 hour maintenance.
2. 50, 250 and 500 hour lubrication.
3. Check antifreeze for protection level and cleanliness.
4. Change hydraulic filter element, if not changed in the last 250 hours and inspect oil from
element.
5. Change transmission filter element and inspect oil from element.
6. Check condition of all operational and warning placards.
7. Torque mounting bolts on rotation bearing and gearbox, winch and axles.
8. Inspect boom sections for signs of overload, excessive wear, or other damage.
9. Perform all maintenance required by engine manual.
1000 HOUR OR 12 MONTH INTERVAL:
1. 500 hour maintenance.
2. 50, 250, 1000 hour and 12 month lubrication.
3. Perform engine maintenance specified in engine manual.
4. Change hydraulic fluid and filter and clean breather and reservoir.
5. Change transmission fluid and filter and clean strainer.
6. Replace vapor block in slip ring. See turret installation in parts manual.
24 MONTH INTERVAL:
1. 12 month maintenance.
2. Pressure test engine cooling system.
3. Flush cooling system.
4. Fill with new coolant and distilled water.
5. Perform all maintenance required by engine manual.
S/N:_______________HOURS:________DATE:________BY:________________________
COMMENTS & PARTS REQUIRED:_____________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
_________________________________________________________________________
Summary of Contents for IC-250-3D
Page 6: ...1 2 IC 250 3D DIMENSIONS...
Page 7: ...1 3 IC 250 3D TURNING DIMENSIONS...
Page 16: ......
Page 30: ...2 14...
Page 42: ......
Page 51: ...3 9 IC 250 3D LUBRICATION CHART...
Page 58: ...3 16...
Page 59: ...3 17...
Page 68: ...3 26 BOOM CHAIN ADJUSTMENT...
Page 73: ......