Remeha Gas 350
6
Suitable chemicals and their use should be discussed
with a specialist water treatment company prior to car-
rying out any work. The specification of the system and
manufacturers recommendations must be taken into
account, along with the age and condition of the system.
New systems should be flushed thoroughly to remove all
traces of flux, debris, grease and metal swarf generated
during installation. Care to be taken with old systems to
ensure any black metallic iron oxide sludge and other
corrosive residues are removed, again by thoroughly
flushing, ensuring that the system is drained completely
from all low points.
NOTE:
Please ensure that the new boiler plant is not in
circuit when the flushing takes place, especially if clean-
sing chemicals are used to assist the process.
Under no circumstances is the boiler to be operated
with cleaning chemicals in the system.
To Summarise:
-
Minimise water loss;
-
Prevent pumping over in open vented systems;
-
Provide adequate air venting at all high points;
-
Keep pH level between 7 - 9 when using additives;
-
Maximum chlorine content of 200 mg/l;
Take advice on the suitability of inhibitors.
4.1.5 Noise level
The noise level measured around the boiler depending
on boiler room construction is about 50 dBA. Noise
levels taken at 1 meter from the boiler.
4.2 Chimneys
The average flue gas temperature is so low (108-
173°C) that the chimney must be made in accordance
with the guidelines of British Gas, BS 6644 and IG 10.
4.3 Installation
standards
The following instructions must be adhered to when the
Remeha Gas 350 is installed:
Gas Safety (installation and use) Regulations 1984 (as
amended).
In addition to the above regulations, this boiler must be
installed in compliance with:
-
Current I.E.E. Regulations for electrical installations;
-
Local building regulations;
-
The Building Standards (Scotland);
- (Consolidation)
Regulations;
-
By-laws of the local water undertaking;
-
Health and Safety Document No 635 ‘The Electricity
at Work Regulations 1989’.
It should also be in accordance with the relevant recom-
mendations in the current editions of the following British
Standards and Codes of Practice, viz. BS 5440 Pt 1 and
2, BS 5449, BS 5546,
BS 6798, BS 6891 and BG.DM2.
Lawfully all gas appliances must be installed by compe-
tent persons (e.g. Corgi, ACOPS).
Failure to install appliances correctly could lead to pros-
ecution.
It is in your own interest and that of safety to ensure that
the law is complied with.
Important:
The Remeha Gas 350 is a certified appliance and must
not be modified or installed in any way contrary to these
‘Installation and Servicing Instructions’. Manufacturer
instructions must NOT be taken in any way as when
overriding statutory obligations.
Summary of Contents for SEAGOLD 1A HR
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ...Atmospheric gas boiler 92 372 kW remeha Gas 3c Technical information ...
Page 98: ...1 remeha Gas 3c ECO Fully condensing atmospheric gas boiler 101 407 kW Technical information ...
Page 124: ...11 9 5 2 Complete instrument panel Fig 09 Wiring diagram for the complete instrument panel ...
Page 130: ...Remeha Gas 350 Atmospheric gas boiler 64 174 kW Technical information R e m e h a G a s 3 5 0 ...
Page 154: ...9 9 5 Wiring diagram boiler Fig 06 Wiring diagram ...
Page 172: ...15 9 7 Wiring diagrams Fig 08 Electrical principle diagram 04 05F SC 00001 ...
Page 178: ......
Page 179: ......
Page 180: ......
Page 181: ......
Page 182: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 186: ......
Page 187: ......
Page 188: ......
Page 189: ......
Page 190: ......
Page 191: ......
Page 192: ......
Page 193: ......
Page 194: ......
Page 195: ......
Page 196: ......
Page 197: ......
Page 198: ......
Page 199: ......
Page 200: ......
Page 201: ......
Page 202: ......
Page 203: ......
Page 204: ......
Page 205: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ...1 Atmospheric gasboiler 276 1044 kW remeha Gas 5a 5a Duo Technical information ...
Page 227: ...12 remeha Gas 5a 5a Duo 8 4 Wiring diagram Fig 05 Wiring diagram ...
Page 248: ......
Page 249: ......
Page 250: ......
Page 251: ......
Page 252: ......
Page 253: ......
Page 254: ......
Page 255: ......
Page 256: ......
Page 257: ......
Page 258: ......
Page 259: ......