6
3. APPLICATION
Output boiler in kW
93
= ... m
3
/h
This minimum flow must be maintained for 5 minutes
after the burner stops firing to avoid high temperature
shut-down due to residual heat gain. Due to the design
and manufacture of the boiler no specific minimum water
flow requirement exists other than for over-temperature
protection.
3.1.4 Water treatment
Water treatment of all systems, but in particular open
vented systems used with the Broag remeha Gas 5a, is
considered necessary good practice in order to:
- avoid metallic corrosion within the system
- avoid sludge and scale information
- reduce to a minimum the risk of microbiological conta-
mination of the system
- minimise chemical action and changes which take
place over a period of time when system water is un-
treated.
The system will contain a variety of metals. Ferrous
metals - cast iron and steel, and non-ferrous metals -
copper, brass and gunmetal, may be present, so it is
essential that treatment is suitable for all of them.
Suitable chamicals and the extent of treatment should be
discussed with specialist manufactures prior to any work
commencing. The specification of new systems and
general condition of older existing systems must be
carefully considered. The removal of debris, flux residue,
grease, metal, swarf etc. from new systems, and any
black magnetic iron exide sludge and other corrosive
residue from old systems is essential.
3.1 L.P.H.W. system
3.1.1 Water temperature
Maximum water temperature is 110
°
C (high limit
thermostat).
Highest operating flow temperature is 95
°
C (control
thermostat).
Minimum return water temperature is 20
°
C at a flowrate
related to a
∆
t of 20
°
C (flow/return temperature).
3.1.2 Water pressure
Boiler sections pressure test at 12 bar.
Maximum pressure test boiler block is 6 bar.
Minimum working pressure boiler is 0.8 bar at a maxi-
mum water temperature of 110
°
C or 0.3 bar at a maxi-
mum water temperature of 95
°
C.
Maximum working pressure boiler is 6 bar.
3.1.3 Water flow
The minimum water flow through the boiler is:
For information on water treatment we advise direct
contact with either:
Fernox Manufacturing Company Ltd.
Britannia Works
Clavering
Essex, CB1L 4QZ
Tel No: 0799 550811
or:
Sentinal
Grace Dearborn Ltd
Widnes
Cheshire WA8 8UD
Tel No: 051 495 1861
3.1.5 Noise level
The noise level measured around the boiler depending
on boiler room construction is about 50-55 dBA.
Noise levels taken at 1 meter from the boiler.
3.2 Chimneys
The average flue gas temperature is so low that the
chimney must be made in accordance with the guidelines
of British Gas.
Summary of Contents for SEAGOLD 1A HR
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ...Atmospheric gas boiler 92 372 kW remeha Gas 3c Technical information ...
Page 98: ...1 remeha Gas 3c ECO Fully condensing atmospheric gas boiler 101 407 kW Technical information ...
Page 124: ...11 9 5 2 Complete instrument panel Fig 09 Wiring diagram for the complete instrument panel ...
Page 130: ...Remeha Gas 350 Atmospheric gas boiler 64 174 kW Technical information R e m e h a G a s 3 5 0 ...
Page 154: ...9 9 5 Wiring diagram boiler Fig 06 Wiring diagram ...
Page 172: ...15 9 7 Wiring diagrams Fig 08 Electrical principle diagram 04 05F SC 00001 ...
Page 178: ......
Page 179: ......
Page 180: ......
Page 181: ......
Page 182: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 186: ......
Page 187: ......
Page 188: ......
Page 189: ......
Page 190: ......
Page 191: ......
Page 192: ......
Page 193: ......
Page 194: ......
Page 195: ......
Page 196: ......
Page 197: ......
Page 198: ......
Page 199: ......
Page 200: ......
Page 201: ......
Page 202: ......
Page 203: ......
Page 204: ......
Page 205: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ...1 Atmospheric gasboiler 276 1044 kW remeha Gas 5a 5a Duo Technical information ...
Page 227: ...12 remeha Gas 5a 5a Duo 8 4 Wiring diagram Fig 05 Wiring diagram ...
Page 248: ......
Page 249: ......
Page 250: ......
Page 251: ......
Page 252: ......
Page 253: ......
Page 254: ......
Page 255: ......
Page 256: ......
Page 257: ......
Page 258: ......
Page 259: ......