15
10.1 Technical information
Control box:
Satronic MMI 816
Main supply:
230 V - 50 Hz
Minimum ionisation current:
min 3 µA (DC).
Reaction time fl ame protection: 1 sec.
Safety time:
10 sec.
Maximum ambient temperature: 60°C
Injector size pilot burner:
Ø 0.8 mm
Injector size main burner:
Ø 5.4 mm
Burner pressure full load:
8.4 mbar (100%)
Burner pressure part load:
2.2 mbar (50%)
Burner pressure pilot burner:
13 mbar
Warning
Control box operates on a neutral/phase supply.
10.2 Commissioning
1. Check gas connections.
2. Check electrical supply (L/N and earth).
3. Check water connections and if installation is fi lled.
4. Switch on circulation pump and check rotation direc-
tion.
5. Open main gas cock (release air in gas pipe work).
6. Switch on electrical supply.
7. Set thermostats at about 85°C.
The following will happen:
8. After a waiting time of about 13 seconds you will
get ignition. At a minimum ionisation current of 7
µA the ignition stops. The main gas valve will open.
The boiler runs.
9. Let the boiler run for a couple of minutes to get rid
of air in the gas pipe.
10. Set the correct burner pressure.
11. Check the thermostats for the correct setting.
12. Check the fl ame protection, start the boiler with the
ionisation probe disconnected.
13. Check the water level control.
10.3 Switching off the boiler
1.
Switch off the electric supply.
2.
Shut off the gas cock.
Be aware of the possibility of the danger of frost.
Note:
Commissioning to only be carried out by a qualifi ed engi-
neer with the relevant training and certifi cation i.e. Acops
- Corgi and a commissioning data sheet completed on site
for issue to owner
11.1 General
It is essential for a good combustion, to clean the boiler,
the gas train and boiler room once a year. This prevents
dust from being aspired and fouling the burners and boi-
ler during operation, thereby avoiding poor combustion
and possibly build-up of soot deposits.
11.2 Maintenance
1. Clean the internal fl ue ways of the boiler. Remove
front casing and cleaning hatches, and remove the
burners.
2. Clean the burners internally and externally.
3. Clean the fl oor underneath the boiler and boiler
room.
4. Clean boiler casings.
5. Clean the gas train, ignition, pilot burner, ther
mostats and wiring.
6. Check start program, ignition time and safety times.
7. Check fl ame protection, and thermostats.
8. Check boiler input at 100% and 50% load.
9. Make a combustion effi ciency calculation.
10. Check the boiler and installation for water leakage
(seals).
11. Check gas train and gas pipe for gas leaks.
11. MAINTENANCE
10. COMMISSIONING
Summary of Contents for SEAGOLD 1A HR
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ...Atmospheric gas boiler 92 372 kW remeha Gas 3c Technical information ...
Page 98: ...1 remeha Gas 3c ECO Fully condensing atmospheric gas boiler 101 407 kW Technical information ...
Page 124: ...11 9 5 2 Complete instrument panel Fig 09 Wiring diagram for the complete instrument panel ...
Page 130: ...Remeha Gas 350 Atmospheric gas boiler 64 174 kW Technical information R e m e h a G a s 3 5 0 ...
Page 154: ...9 9 5 Wiring diagram boiler Fig 06 Wiring diagram ...
Page 172: ...15 9 7 Wiring diagrams Fig 08 Electrical principle diagram 04 05F SC 00001 ...
Page 178: ......
Page 179: ......
Page 180: ......
Page 181: ......
Page 182: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 186: ......
Page 187: ......
Page 188: ......
Page 189: ......
Page 190: ......
Page 191: ......
Page 192: ......
Page 193: ......
Page 194: ......
Page 195: ......
Page 196: ......
Page 197: ......
Page 198: ......
Page 199: ......
Page 200: ......
Page 201: ......
Page 202: ......
Page 203: ......
Page 204: ......
Page 205: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ...1 Atmospheric gasboiler 276 1044 kW remeha Gas 5a 5a Duo Technical information ...
Page 227: ...12 remeha Gas 5a 5a Duo 8 4 Wiring diagram Fig 05 Wiring diagram ...
Page 248: ......
Page 249: ......
Page 250: ......
Page 251: ......
Page 252: ......
Page 253: ......
Page 254: ......
Page 255: ......
Page 256: ......
Page 257: ......
Page 258: ......
Page 259: ......