17
12. Set the correct
full load burner pressure
by means
of the pressure regulator on the gas multibloc gas
valve(see Fig. 10, pos. 1).
Warning:
When the required burner pressure can
not be reached because of low inlet pressure, ensu-
re that the pressure regulator remains within it’s
operating range.
Now do the following:
•
Set the burner pressure to the highest possible
value (but not over the required full load burner
pressure).
•
Turn the pressure regulator anticlockwise until the
burner pressure is affected.
•
The burner pressure is now limited, this will pre-
vent the boiler from being over gassed should the
inlet gas pressure increase.
13.
Set the correct
part load burner pressure:
•
Turn the high/low thermostat to it’s minimum set-
ting (35°C). When the flow temperature is over
35°C, the boiler will burn at part load.
•
Set the part load burner pressure by turning the
adjustment ring (Fig. 10, pos. 2).
•
To check the the high fire setting: Turn the
high/low thermostat to 85°C and check the full
load burner pressure (if necessary re-adjust).
The speed of opening of the main gas valve can
also be adjusted to ensure a smooth light up. Set-
ting the hydraulic brake on the main gas valve as
follows:
•
Remove the setting cap (Fig. 10, pos.3) and turn it
upside down on the hydraulic brake.
•
Turn it clockwise to slow down, anticlockwise to
speed up.
•
Check both burner pressures again and if neces-
sary re-adjust.
14. Adjustment of the
gas pressure switch
LD (optional):
•
Switch the boiler to full load.
•
Connect a pressure gauge to measuring point LD.
•
Turn the adjustment disc of the pressure switch to
it’s minimum setting.
•
Now close the main gas cock slowly until the inlet
pressure drops to the value detailed in the docu-
mentation supplied with the gas pressure switch.
•
Slowly turn the adjustment disc of the pressure
switch until the pressure control operates.
•
The control box shuts down the gas supply and
will restart.
15. Adjustment of the
gas pressure switch HD
(optional):
•
Switch the boiler to full load.
•
Connect a pressure gauge to manifold.
•
Set the pressure switch to the value detailed in
the documentation supplied with the gas pressure
switch.
•
Check whether the gas pressure switch HD comes
to action at the set value by increasing (Fig. 10,
pos.1) the full load burner pressure to that value.
The boiler will lock out.
•
Reset by pressing the reset button on the gas
pressure switch HD. The boiler will resume opera-
tion.
•
Set the correct full load burner pressure again
according §10.2.12.
16.
Valve leakage control
(optional)
•
Remove plug Pa during boiler start up (see §10.2.
9).The plug Pa is located opposite the valve lea-
kage control on the multibloc.The boiler will lock
out.
•
Reset by pressing the reset button on the valve
leakage control.The boiler will resume normal ope-
ration.
17. Check the
thermostats
for the correct operation set-
ting.
18. Check the
flame control on the control
box
•
Start the boiler with disconnected ionisation probe,
after the ignition phase the pilot gas valve must
close. The boiler will lock out.
•
Reset by pressing the reset button on the control
box.
•
Then disconnect the ionisation probe during opera-
tion, the pilot gas valve must close immediately.
The boiler will lock out.
•
Reset by pressing the reset button on the control
box.
19.
Water level control
:
•
Check the water level.
•
Check the operation of the water level control by
disconnecting the electrode. The boiler should go
to lock out
•
Create a shortcut between the electrode and
earth. The boiler should go to lock out
•
Reset by pressing the reset button on the instru-
ment panel.
The boiler will resume operation
20. Check the
down draft thermostat
by pressing the
bimetallic strip on the thermostat. The boiler will shut
down for 3 minutes. After that the boiler will resume
operation.
21. Send the initial commissioning report CE to Broag.
Summary of Contents for SEAGOLD 1A HR
Page 1: ......
Page 2: ......
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ......
Page 7: ......
Page 8: ......
Page 9: ......
Page 10: ......
Page 11: ......
Page 12: ......
Page 13: ......
Page 14: ......
Page 15: ......
Page 16: ......
Page 17: ......
Page 18: ......
Page 19: ......
Page 20: ......
Page 21: ......
Page 22: ......
Page 23: ......
Page 24: ......
Page 25: ......
Page 26: ......
Page 27: ......
Page 28: ......
Page 29: ......
Page 30: ......
Page 31: ......
Page 32: ......
Page 33: ......
Page 34: ......
Page 35: ......
Page 36: ......
Page 37: ......
Page 38: ......
Page 39: ......
Page 40: ......
Page 41: ......
Page 42: ......
Page 43: ......
Page 44: ......
Page 45: ......
Page 46: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 50: ......
Page 51: ......
Page 52: ......
Page 53: ......
Page 54: ......
Page 55: ......
Page 56: ......
Page 57: ......
Page 58: ......
Page 59: ......
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ......
Page 65: ......
Page 66: ......
Page 67: ......
Page 68: ......
Page 69: ......
Page 70: ......
Page 71: ......
Page 72: ......
Page 73: ......
Page 74: ......
Page 75: ......
Page 76: ......
Page 77: ......
Page 78: ......
Page 79: ......
Page 80: ......
Page 81: ......
Page 82: ...Atmospheric gas boiler 92 372 kW remeha Gas 3c Technical information ...
Page 98: ...1 remeha Gas 3c ECO Fully condensing atmospheric gas boiler 101 407 kW Technical information ...
Page 124: ...11 9 5 2 Complete instrument panel Fig 09 Wiring diagram for the complete instrument panel ...
Page 130: ...Remeha Gas 350 Atmospheric gas boiler 64 174 kW Technical information R e m e h a G a s 3 5 0 ...
Page 154: ...9 9 5 Wiring diagram boiler Fig 06 Wiring diagram ...
Page 172: ...15 9 7 Wiring diagrams Fig 08 Electrical principle diagram 04 05F SC 00001 ...
Page 178: ......
Page 179: ......
Page 180: ......
Page 181: ......
Page 182: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 186: ......
Page 187: ......
Page 188: ......
Page 189: ......
Page 190: ......
Page 191: ......
Page 192: ......
Page 193: ......
Page 194: ......
Page 195: ......
Page 196: ......
Page 197: ......
Page 198: ......
Page 199: ......
Page 200: ......
Page 201: ......
Page 202: ......
Page 203: ......
Page 204: ......
Page 205: ......
Page 206: ......
Page 207: ......
Page 208: ......
Page 209: ......
Page 210: ......
Page 211: ......
Page 212: ......
Page 213: ......
Page 214: ......
Page 215: ......
Page 216: ...1 Atmospheric gasboiler 276 1044 kW remeha Gas 5a 5a Duo Technical information ...
Page 227: ...12 remeha Gas 5a 5a Duo 8 4 Wiring diagram Fig 05 Wiring diagram ...
Page 248: ......
Page 249: ......
Page 250: ......
Page 251: ......
Page 252: ......
Page 253: ......
Page 254: ......
Page 255: ......
Page 256: ......
Page 257: ......
Page 258: ......
Page 259: ......