![Bristan Acute AE 1/2 C Installation Instructions Manual Download Page 12](http://html1.mh-extra.com/html/bristan/acute-ae-1-2-c/acute-ae-1-2-c_installation-instructions-manual_2813394012.webp)
12
4. Fit the tap body
Remove the cover caps and grease the
push-fit connectors using the sachet of
grease provided. Push-fit the tap body
onto the connector.
Align the body and tighten both grub
screws at the rear of the body using the
long end of the 2.5mm hexagonal key as
shown below until finger tight. Remove
the hexagonal key and insert the short
end into the grub screw and tighten an
extra ¾ to 1 complete turn more to ensure
the tap body is securely tightened to the
push-fit connector.
Important:
The fitting must be
securely attached to the base.
Bath Taps - Installation
x 2 Grubscrews
Push-fit the grey rubber plugs into the
grub screw holes.
Turn on the mains water supply and
open the isolating valves using a suitable
flatblade screwdriver.
Operation
Move the hot lever left and the cold lever
right to increase the flow of water.
Cold
Hot
2.5mm
hexagonal key
Push-fit connector