![BREDABEDS METROPOLITAN MURPHY Assembly Instructions Manual Download Page 33](http://html1.mh-extra.com/html/bredabeds/metropolitan-murphy/metropolitan-murphy_assembly-instructions-manual_2806588033.webp)
33
Chapter 6: Installing the handles, leg support and mattress.
Chapter 6:
Installing the handles, leg
support and mattress.
Using the handles and provided screws from Hardware
Package #9, attach the handles to the Bed Face Panel at the
location of the pre-drilled holes. It may be easiest to have one
person hold the handle on the Bed Face Panel while another
person tightens the screws from the backside with a drill.
STEP 1
REQUIRED TOOLS
REQUIRED HARDWARE
• Cordless Drill w/ #2 Phillips bit
• 7/16” Socket
• 1/2” Socket
• Hardware Card #4
(frame box)
• Hardware Card #5
(Optional)
• Hardware Package #9
(white box)
At this point you can install the mattress in the frame, balancing
the spring tension will be covered in the next chapter. The mattress
sits directly on top of the support stiff eners. It’s normal to have
a height diff erence between the support stiff eners and the bed
doors. This isn’t an issue with nearly all mattresses, since the
diff erence is distributed throughout the mattress.
STEP 2
FIG. 6A - LEG ASSEMBLY, RIGHT SIDE
Referring to Fig.
6A and using the
large washers from
Hardware Card #4
and 5/16” Nylock
nut pre-threaded
onto each leg,
install legs with the washers in order
as shown (3 1/4” from the edge of the
frame).
Tighten Nylock nut with a 1/2” socket to
have a small amount of friction when
the leg assembly is rotated between the
up and down positions.
STEP 3
STOP
If you have any questions, contact us (phone:
1-855-466-4781, email:
[email protected] or live chat: https://bredabeds.com) before proceeding.
*** STOP - SAFETY CHECKLIST ***
DO NOT PROCEED PAST THIS POINT WITHOUT FIRST VERIFYING THE FOLLOWING:
Have the bolts in Hole #2 been inserted?