100-214-276 Rev. 3
iii
2000X aed Actuator
Instruction Manual
H
Handling and Unpacking - - - - - - - - - - - - - - - - - - - - - 4-2
Host Computer - - - - - - - - - - - - - - - - - - - - - - - - - 4-25
Humidity- - - - - - - - - - - - - - - - - - - - - - - - - - - - - 5-1
I
In-line air filter - - - - - - - - - - - - - - - - - - - - - - - - - - 4-16
Input Power (Main) - - - - - - - - - - - - - - - - - - - - - - - 4-23
Input Power Plug - - - - - - - - - - - - - - - - - - - - - - - - 4-29
Installation- - - - - - - - - - - - - - - - - - - - - - - - - - - - 4-1
Installation Requirements - - - - - - - - - - - - - - - - - - - - 4-9
Installation Steps - - - - - - - - - - - - - - - - - - - - - 4-16, 4-17
Installing the Stack in the Actuator
30 kHz and 40 kHz Stacks - - - - - - - - - - - - - - - - - - 4-40
Installling the Stack in the Actuator
20 kHz Stacks - - - - - - - - - - - - - - - - - - - - - - - - 4-38
Interconnect between Power Supply and Actuator - - - - - - - - 4-23
L
Limit Switch - - - - - - - - - - - - - - - - - - - - - - - - - - - 5-3
Load Cell - - - - - - - - - - - - - - - - - - - - - - - - - - - - 5-6
Load Cell and Dynamic Follow Through - - - - - - - - - - - - - 5-6
M
Maintenance - - - - - - - - - - - - - - - - - - - - - - - - - - 7-1
Periodic and Preventive - - - - - - - - - - - - - - - - - - - 7-1
Mechanical Stop - - - - - - - - - - - - - - - - - - - - - - - - - 5-4
Module Options DIP Switch - - - - - - - - - - - - - - - - - - - 4-30
Mounting the Fixture on the Branson Base - - - - - - - - - - - - 4-41
Mylar Washer Kit - - - - - - - - - - - - - - - - - - - - - - - - 4-7
O
Operating the Actuator - - - - - - - - - - - - - - - - - - - - - - 6-5
Operation - - - - - - - - - - - - - - - - - - - - - - - - - - - - 6-1
Output Power (RF Cable) - - - - - - - - - - - - - - - - - - - - 4-23
Output Signal - - - - - - - - - - - - - - - - - - - - - - - - - - 4-30
DOC EXPIRES 12PM 7/24/2012. Article or Material must comply with the requirements
stipulated by RoHS in its current version