Initial start-up
2
26
Installation and maintenance instructions for wall-mounted condensing gas boiler 600 - 28C • 01/2004
Subject to modifications resulting from technical improvements!
Boulter Buderus Ltd. • http://www.boulter-boilers.com
2.1.3
Setting the heating capacity
The heating capacity can be adjusted on the BC 10.
z
Press the chimney sweep button and the service button at
the same time until "
L--
" (see fig. 39) appears in the
display.
z
Adjust the capacity with the reset button and chimney
sweep button. The range is from "
L01
..
L99
" (see table 6).
To run the boiler at 100% set to "
L--
"
z
Confirm the setting by pressing the service button two
times (see fig. 39, item 1).
2.1.4
Checking for leaks
Use a suitable pressure gauge for the different pressure read-
ings. It should be able to handle pressures a minimum of
50 mbar with an accuracy of 0.01 mbar minimum.
z
Disconnect the system from the power supply.
z
Check all sections of gas pipework and connections for
signs of leaks before starting up the system for the first
time. If a leak is detected during tightness testing, use an
approved leak detector to check all connections for
possible escapes.
The product must be certified as a gas leak-testing agent.
DO NOT allow the product to come into contact with elec-
trical wiring.
The test pressure of the gas pipe when the gas shutoff valve is
open may not exceed 150 mbar.
fig. 39 Maximum heating capacity
2
1
Display [%]
Heating capacity at 40/30 °C
[kW]
600 - 28C
L25
6.0
L30
7.2
L35
8.4
L40
9.6
L45
10.8
L50
12.0
L55
13.2
L60
14.4
L65
15.6
L70
16.8
L75
18.0
L80
19.2
L85
20.4
L90
21.6
L95
22.8
L--
24.0
Table 6
Heating capacity in percentages
AtTTENTION
Check the used measuring nipples for gas
tightness.