Servicing
5
60
Installation and maintenance instructions for wall-mounted condensing gas boiler 600 - 28C • 01/2004
Subject to modifications resulting from technical improvements!
Boulter Buderus Ltd. • http://www.boulter-boilers.com
z
Install the new internal mechanism in reverse order.
Making sure that the flat side is facing down (see fig. 98).
z
Reconnect the servomotor to the three-way valve in
reverse order.
z
Fill and purge the system.
5.3.17 Replacing the terminal strip
z
Note order of cable terminals. Loosen all cables.
z
Connect the cables, in the right order, to the new terminal
strip.
5.3.18 Checking KIM connections
z
Disconnect the boiler from the mains power supply.
z
Remove the UBA 3 (see subsection 5.3.2).
z
Check if 4 pin connector (fig. 99, item 1) is fitted and
secure.
fig. 98 Internal mechanism of three-way valve
fig. 99 KIM connections
Pin
1
28 55
Pin
81
Pin
16
Pin
1
KIM
81 pin connector laagspanning
16 pin connector hoogspanning
1
NOTE
This is not a serviceable part and any fault
identified with this component, contact Boulter
Buderus.