![Boss Industrial GD13T21 Owner'S Manual Download Page 16](http://html1.mh-extra.com/html/boss-industrial/gd13t21/gd13t21_owners-manual_2794693016.webp)
Page 10
NOTE:
Due to the weight / size of the log splitter, it’s recommended that two or more adults be present to assist with the
assembling. Some lifting tools such as a hoist, crane or jack are recommended.
Assembling tools needed:
1. Wrench 13mm x 2 6. Needle nose pliers x 1
2. Wrench 14mm x 2 7. Allen wrench 3mm x 1
3. Wrench 16, 17, 18, 19, 27, 32 mm one each 8. Flat head screwdriver x 1
4. Wrench 1 / 2 ” x 1 9. Soft faced hammer x 1
5. Adjustable wrench x 1 10. Thread locking compound x 1
STEP 1:
Installing the fenders. See FIGURE 3.
1. Loosely secure the fender to the fender support, then loosely secure fender with support attached to the reservoir
assembly as shown using the hardware in the hardware kit #1.
2. Tighten the hardware using two 13mm wrenches.
REF. NO.
DECSRIPTION
QTY.
1
Reservoir tank assembly
1
2
Fender
2
3
Hardware Kit #1, i
ncluding:
1
3-1
Fender support
2
3-2
Hex head bolt / M8 x 25
2
3-3
Hex head bolt / M8 x 20
6
3-4
Flat washer / Ø9 x Ø24 x 1.5
2
3-5
Flat washer / M8
14
3-6
Lock nut / M8
8
ASSEMBLY & SET-UP INSTRUCTIONS
ASSEMBLING
(FIGURE 3)
Page 13