RE 30139-B/12.14 | VT-HNC100...X
Bosch Rexroth AG
37/
48
Commissioning
7 Commissioning
7.1 First commissioning
NOTE
Uncontrolled connection or disconnection of plug-in connectors!
The device might be destroyed.
f
Before installation works, and before connecting or disconnecting plug-in
connectors to or from the device, the device must be disconnected from the
voltage supply or reliably de-energized.
Devices damaged due to incorrect installation are not covered by the
warranty.
f
Observe protection class, voltage supply and environmental conditions
according to data sheet RE 30139.
From series 31 onward of VT-HNC100..3x with Ethernet interface (see type
code, bus connection PROFINET, Ethernet/IP or PROFIBUS DP with TCP/
IP), firmware 7.05.02, or higher must be used.
Further information and download:
http://www.boschrexroth.com/hnc100
Should you have further queries, please contact
eMail: [email protected]
./33
4/33B
3FYSPUI
.BEFJO(FSNBOZ
8
75)/$/*
Series
The basis for the functionality of the VT-HNC100...3X is the preparation of the
application with software WIN-PED® 6 or WIN-PED® 7. For operation, the
VT-HNC100...3X must be connected with the PC ready for operation, and the PC
must be online.
It is also possible, to start the acceptance of existing project data from the
VT-HNC100...3X directly from the program WIN-PED® 6.X. In this case too,
the VT-HNC100...3X must be connected with the PC ready for operation, and
the PC must be online.
f
Select the “Communication” menu.
f
Select “Upload data” and “Search directly connected controls”.
After the acceptance of the existing project data and the HNC software, the
program WIN-PED® 6.X is ready for operation together with the
VT-HNC100...3X, and the actual project planning, programming and diagnosis
of the control system can be started.
The HNC software version with which the VT-HNC100...3X was initialized,
must already be installed on the PC before project data can be acquired.