Aspirating Smoke Detector
Commissioning | en
109
Bosch Sicherheitssysteme GmbH
Operation Guide
2018.04 | 2.0 | F.01U.130.926
Notice!
Once any faults have been rectified, the parameter settings must be restored to their original
status via the RPS software.
The commissioning procedure must be repeated from
Calibrating the Airflow Sensor, page 104
.
Once commissioning has been concluded, the set values must be collected and saved using
the DIAG Diagnostic Software. A printout of the set values should be placed in the project
folder.
See also
–
–
Summary of Contents for FAS-420
Page 1: ...Aspirating Smoke Detector FCS 320 TP1 FCS 320 TP2 en Operation Guide ...
Page 2: ......
Page 133: ......