BEI JING BOREY TECH CO., LTD Website:www.en.boreytech.com
Select “Running mounting”and press OK t
o enter by→←keys,select the folder you
are programming by →←,select“Start Mounting”and press OK to enter by
controlling nozzle↑↓ keys,and click OK to appear the interface as follows:
Then continue OK,enter the mounting interface,as shown:
Appear the check first point operation,if the camera is a bit offset,you can move back
and forth through the XY,you can also move through the sliding table,and press OK to
mount after confirm.When the mounting is completed,the system will appear mounting
finished,system resetting.