EM-RES-03
10/07
20
20 EM-RES-03
10/07
Initialization
Pre-Operational
Operational
Stopped
Power on
any state
(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
After Power On and the initialization, the slaves are in the Pre-Operational state.
The transition (2) is automatic. The system bus master (frequency inverter or
PLC/PC) triggers the transition (3) to Operational state.
The transitions are controlled via NMT telegrams.
The identifier used for the NMT telegrams is "0" and may only be used by the system
bus master for NMT telegrams. The telegram contains two data bytes.
Byte 0
Byte 1
CS (Command Specifier)
Node-ID
Identifier = 0
With the statement of the node ID
≠
0, the NMT command acts on the subscriber
selected via the node ID. If node ID = 0, all the subscribers are addressed. If Node-
ID = 0, all nodes are addressed.
Transition
Command
Command Specifier
(3) , (6)
Start Remote Node
1
(4) , (7)
Enter Pre-Operational
128
(5) , (8)
Stop Remote Node
2
-
Reset Node
129
-
Reset Communication
130
Note:
A frequency inverter defined as a system bus master only transmits the
command "Start Remote Node” with node ID = 0 (for all subscribers).
Transmission of the command is done after completion of the initializa-
tion phase and the time delay
Boot-Up Delay
904 following it.
Summary of Contents for Vectron
Page 1: ...ACTIVE CUBE Expansion Module EM RES 03 Frequency Inverter 230 V 400 V...
Page 2: ......
Page 73: ......