B
DTRen-2008/SPA-5/LVA
Rev.:
a
Page 25
Bombardier Transportation (ZWUS) Polska Sp. z o.o.
When all barriers reach the upper position then the whole circuit is prepared to
close barriers.
Continuity of the barrier is checked. If lack of the barrier continuity is detected then
respective barrier machine will not move any more.
Related documents:
DTRen-2009/EEG-1 [3], DTRen-2009/EEG-3 [4], DTRen-2003/ESD-8 [5]
This
training
material
has
been
prepared
only
for
educational
purposes
and
it
isn't
technical
documentation.