
B
DTRen-2008/SPA-5/LVA
Rev.:
a
Page 6
Bombardier Transportation (ZWUS) Polska Sp. z o.o.
- Braking boom detector
circuits
- Brake-away protection
Yes
multiple use (with ball safety device)
Interlocking interface
Interlocking (Ebilock)
interface
EDJ-5 (electronic interface)
Manufacturer
BT ZWUS
Control System
Control and power supply
unit
ERR-20 – LX shelter
ERR-24 – LX rack
Manufacturer
BT ZWUS
Control system:
- CPU
- RAM
- Program Memory
- Program cycle
2 x PLC series 2003
7CP476
750Kbyte SRAM,
1,5Mbyte Flash PROM
50ms
Manufacturer
B&R (Austria)
Automatic/manual operation
Automatic operation
System engagement /
disengagement from the interlocking
system
Manual operation
Manual system engagement /
disengagement from the shelter/rack
and from the Control Panel
Monitoring and diagnostics
Remote Control Device:
- Visualization of 1-8 LXs
- Registration time
ERP-7
Panel PC with 12”LCD touch-screen
2 x 8 LED
2 x Audible alarm
at least 1 month
Manufacturer
BT ZWUS
Local Diagnostic Panel:
- Visualization
- Operation
EZG-17
LCD display 2x40 digits
5-key keyboard
Manufacturer
BT ZWUS
Event Logging Unit
- Data access
- Registration
EZE-2
PC application
65000 records
Manufacturer
BT ZWUS
Safety
Hardware
- 2 independent PLC controlled
channels A and B
- 2 independent power supply
This
training
material
has
been
prepared
only
for
educational
purposes
and
it
isn't
technical
documentation.