B
DTRen-2008/SPA-5/LVA
Rev.:
a
Page 8
Bombardier Transportation (ZWUS) Polska Sp. z o.o.
4.2
Construction and configuration
4.2.1 System
configuration
SPA-5/LVA consists of the control and supply devices ERR-2 (in shelter or as a
rack to be placed in the interlocking shelter) and external devices. Application
configuration is defined by a product symbol (see 4.6).
Following external devices can be connected to the SPA-5/LVA:
Device
Quantity
EHZ-8 LED Road Signal with two or three
aspects
max 6
EEG-1 Gate Machine with ESD-8 boom
max 8
EDG-4 Audible Alarm
max 4
EDJ-50 Interlocking Interface
1
Control Panel
1
EZE-2 Event Logger
1 (option)
EZG-17 Local Diagnostic Panel
1
ERP-7 Remote Control Device
1
EAR-1 Control Panel
1 (option)
This
training
material
has
been
prepared
only
for
educational
purposes
and
it
isn't
technical
documentation.