![BOC Edwards iL600 Instruction Manual Download Page 124](http://html1.mh-extra.com/html/boc-edwards/il600/il600_instruction-manual_2781982124.webp)
6.13
Relocate the iL system for maintenance
WARNING
Use suitable lifting equipment to move the iL system.
If you want to remove the iL system from its operating location and move it to another location
where you will do maintenance, use the following procedure.
1.
Purge the iL system (refer to Section 6.1.2), then shut down the iL system as described in
Section 5.8 and allow the iL system to cool down.
2.
Refer to Figure 3-10. Disconnect the mating-half from the electrical supply connector (9) on
the Electrics and Pump Control Module.
3.
Refer to Figure 1-4. Switch off your cooling-water supply, then disconnect the cooling-water
supply and return pipelines from the cooling-water inlet and outlet (3, 2).
4.
Refer to Figure 1-1. Disconnect the inlet (1) from your vacuum system and disconnect the
outlet (16) from your exhaust-extraction system. Fit blanking caps to your vacuum and
exhaust-extraction pipelines and to the iL inlet and outlet (1, 16).
5.
If necessary, disconnect the iL air-extraction port (see Figures 2-1 and 2-2) from your factory
extraction system.
6.
Refer to Figure 1-1. Adjust the levelling feet (8) so that the iL system rests on the castors (9).
7.
Refer to Figure 3-5. If necessary (that is, if you want to use lifting equipment to move the iL
system), refit the four transit brackets to the vibration isolators: refit each transit bracket (2)
to the vibration isolator (3), then refit the nuts and washers (4) to secure the transit brackets in
place.
8.
Move the iL system to the location where you want to do maintenance.
9.
If necessary (depending on the maintenance you will do), disconnect any accessories from
the iL system.
After maintenance is complete, re-install the iL system as described in Section 3.
iL Dry Pumping Systems
6-13