
Page 84
Mounting the Work.
The DeWalt Rotary Tool should
NEVER
be plugged in
when mounting a work piece.
Always unplug the power
supply when removing or installing router bits. Failure
to follow this simple procedure may result in serious
personal injury.
Danger!
The E3 kit includes clamping hardware. Insert the wing nut onto the
2”
¼
-
20 screw as shown. The screws
will thread into the inserts on the table. The extra clamps can be used as spacers as shown in the
pictures.
If you are new to CNC Routing we offer a quick start guide to walk you thru the software setup and
help get you routing. Please check
BobsCNC.com
for the latest copy.
Tips for cutting with the E3
•
Always unplug the router before changing the bits
•
Do not leave the router unattended.
•
Use a scrap board underneath the work to keep from engraving into the spoil
board.
•
For work such as isolation routing for circuit boards, consider milling a scrap
blank, then use double
-
sided tape to fasten the circuit board.
Summary of Contents for E3
Page 1: ...Page 1 Version 2 15 Assembly Manual E3 ...
Page 21: ...Page 21 Step 5 Attach Y Carriage Bottom Support and secure with five M4 x 16 screws and nuts ...
Page 22: ...Page 22 Step 6 Attach Z Rail Stop and secure with two M4 x 16 screws and nuts ...
Page 31: ...Page 31 Slide 8 x 22 x 7 Bearing on Threaded Rod Thread 5 16 Nut on top of the Bearing ...
Page 37: ...Page 37 Secure Stepper Motor Mount with four M4 x 16 Screws and Nuts ...
Page 45: ...Page 45 1 2 IMPORTANT Note the orientation of the Controller Mount below ...
Page 46: ...Page 46 1 4 Using slots and tabs set the Controller Mount Assembly on the Gantry Frame 1 3 ...
Page 50: ...Page 50 Attach Idler Mount and secure with a M4 x 16 screw and nut Step 4 ...
Page 60: ...Page 60 ...
Page 71: ...Page 71 These photos illustrate how the belt wraps around the GT2 Pulley and Idler ...