
Page 10
All screws (unless noted) should be installed snug, then rotated 1 to 2 1/2 turns.
The 5/16 threaded rod should be centered through both washers and turn
freely through the coupler nut and not rub on the washers.
Secure Assembly components with six M4 x 16 Screws
and Nuts.
Step 6
Thread Large Zip Tie beneath Z Supports
and coupler as shown and tighten
securely.
Step 7
Apply LOCTITE to all screws.
Position the nut in
“
T
”
of the T
-
Slot before
inserting screws and tightening.
Summary of Contents for E3
Page 1: ...Page 1 Version 2 15 Assembly Manual E3 ...
Page 21: ...Page 21 Step 5 Attach Y Carriage Bottom Support and secure with five M4 x 16 screws and nuts ...
Page 22: ...Page 22 Step 6 Attach Z Rail Stop and secure with two M4 x 16 screws and nuts ...
Page 31: ...Page 31 Slide 8 x 22 x 7 Bearing on Threaded Rod Thread 5 16 Nut on top of the Bearing ...
Page 37: ...Page 37 Secure Stepper Motor Mount with four M4 x 16 Screws and Nuts ...
Page 45: ...Page 45 1 2 IMPORTANT Note the orientation of the Controller Mount below ...
Page 46: ...Page 46 1 4 Using slots and tabs set the Controller Mount Assembly on the Gantry Frame 1 3 ...
Page 50: ...Page 50 Attach Idler Mount and secure with a M4 x 16 screw and nut Step 4 ...
Page 60: ...Page 60 ...
Page 71: ...Page 71 These photos illustrate how the belt wraps around the GT2 Pulley and Idler ...