
Page 16
Step 13
Secure the Z Spindle Top Mount with two M4 x 16 screws and nuts as
shown.
Step 14
Install two SG20U bearings with the M6 x 25 screws, 6mm
washers and M6 nuts. The bearing hubs must face the wood as
illustrated below The screws in the round holes should installed
snug, then rotated two to four turns.
Make sure the hub of the bearing faces the wood. IMPORTANT: the screw
must be oriented so that the nut is visible when looking at the back of the
carriage (see photo below).
Hub
Apply LOCTITE to all screws.
Summary of Contents for E3
Page 1: ...Page 1 Version 2 15 Assembly Manual E3 ...
Page 21: ...Page 21 Step 5 Attach Y Carriage Bottom Support and secure with five M4 x 16 screws and nuts ...
Page 22: ...Page 22 Step 6 Attach Z Rail Stop and secure with two M4 x 16 screws and nuts ...
Page 31: ...Page 31 Slide 8 x 22 x 7 Bearing on Threaded Rod Thread 5 16 Nut on top of the Bearing ...
Page 37: ...Page 37 Secure Stepper Motor Mount with four M4 x 16 Screws and Nuts ...
Page 45: ...Page 45 1 2 IMPORTANT Note the orientation of the Controller Mount below ...
Page 46: ...Page 46 1 4 Using slots and tabs set the Controller Mount Assembly on the Gantry Frame 1 3 ...
Page 50: ...Page 50 Attach Idler Mount and secure with a M4 x 16 screw and nut Step 4 ...
Page 60: ...Page 60 ...
Page 71: ...Page 71 These photos illustrate how the belt wraps around the GT2 Pulley and Idler ...