
Page 54
Install three sets of Idler Bearings by inserting a M5 x 25
Screw into the Flanged Bearings (keeping the flanges
outboard). Thread a nut on the M5 Screw and tighten
(see bolt pattern below):
Step 9
Flanges must be positioned
toward the outside (outboard).
Move the SG20U Bearings in the elongated holes
upward and snug the nuts and rotate 1/4 turn. These
will be tightened when installed on the Main Frame.
Step 8
Summary of Contents for E3
Page 1: ...Page 1 Version 2 15 Assembly Manual E3 ...
Page 21: ...Page 21 Step 5 Attach Y Carriage Bottom Support and secure with five M4 x 16 screws and nuts ...
Page 22: ...Page 22 Step 6 Attach Z Rail Stop and secure with two M4 x 16 screws and nuts ...
Page 31: ...Page 31 Slide 8 x 22 x 7 Bearing on Threaded Rod Thread 5 16 Nut on top of the Bearing ...
Page 37: ...Page 37 Secure Stepper Motor Mount with four M4 x 16 Screws and Nuts ...
Page 45: ...Page 45 1 2 IMPORTANT Note the orientation of the Controller Mount below ...
Page 46: ...Page 46 1 4 Using slots and tabs set the Controller Mount Assembly on the Gantry Frame 1 3 ...
Page 50: ...Page 50 Attach Idler Mount and secure with a M4 x 16 screw and nut Step 4 ...
Page 60: ...Page 60 ...
Page 71: ...Page 71 These photos illustrate how the belt wraps around the GT2 Pulley and Idler ...