
Page 19
Step 1
Place Z Carriage Rail Support into the Y Carriage Frame and secure with
three
M4 x 16 screws and nuts (see below):
Step 2
Place second Z Carriage Rail Support into the Y Carriage Frame
and secure with three M4 x 16 screws and nuts (see below):
Try placing
1”
strips of blue painters tape behind the T
-
Slots to help hold the nuts
in place.
All screws (unless noted) should be installed snug, then rotated 1
-
1/2 to 2 turns.
Summary of Contents for E3
Page 1: ...Page 1 Version 2 15 Assembly Manual E3 ...
Page 21: ...Page 21 Step 5 Attach Y Carriage Bottom Support and secure with five M4 x 16 screws and nuts ...
Page 22: ...Page 22 Step 6 Attach Z Rail Stop and secure with two M4 x 16 screws and nuts ...
Page 31: ...Page 31 Slide 8 x 22 x 7 Bearing on Threaded Rod Thread 5 16 Nut on top of the Bearing ...
Page 37: ...Page 37 Secure Stepper Motor Mount with four M4 x 16 Screws and Nuts ...
Page 45: ...Page 45 1 2 IMPORTANT Note the orientation of the Controller Mount below ...
Page 46: ...Page 46 1 4 Using slots and tabs set the Controller Mount Assembly on the Gantry Frame 1 3 ...
Page 50: ...Page 50 Attach Idler Mount and secure with a M4 x 16 screw and nut Step 4 ...
Page 60: ...Page 60 ...
Page 71: ...Page 71 These photos illustrate how the belt wraps around the GT2 Pulley and Idler ...