
Page 67
As the SG20U Bearings roll across the rod there should
be a small amount of
preload
(i.e., they should securely
engage the rail and roll firmly). Check the upper bearings
to ensure that they are snug up against the rail. The
bearing should move along the rail when rotated by
hand.
If any of the bearings rotate without engaging the rail:
•
Remove both of the Y rods
•
Loosen the 2 nuts on the slotted holes on each side and slide the SG20U bearings upward
•
Snug the SG20U bearing nuts
•
Repeat 1 thru 4.
Place the remaining Y Rail Stops on the Gantry Side and secure
each with M4 x 25 screws and nuts. Please note the orientation
(the Rail Stop must cover the ends of the rails, keeping them in
place).
Step 4
Summary of Contents for E3
Page 1: ...Page 1 Version 2 15 Assembly Manual E3 ...
Page 21: ...Page 21 Step 5 Attach Y Carriage Bottom Support and secure with five M4 x 16 screws and nuts ...
Page 22: ...Page 22 Step 6 Attach Z Rail Stop and secure with two M4 x 16 screws and nuts ...
Page 31: ...Page 31 Slide 8 x 22 x 7 Bearing on Threaded Rod Thread 5 16 Nut on top of the Bearing ...
Page 37: ...Page 37 Secure Stepper Motor Mount with four M4 x 16 Screws and Nuts ...
Page 45: ...Page 45 1 2 IMPORTANT Note the orientation of the Controller Mount below ...
Page 46: ...Page 46 1 4 Using slots and tabs set the Controller Mount Assembly on the Gantry Frame 1 3 ...
Page 50: ...Page 50 Attach Idler Mount and secure with a M4 x 16 screw and nut Step 4 ...
Page 60: ...Page 60 ...
Page 71: ...Page 71 These photos illustrate how the belt wraps around the GT2 Pulley and Idler ...