Quick Reference Sheet
-
Primary Guying Only
DEPLOYMENT
Read Manual Before Use
Refer to detailed instructions in the
350G XL Lift Series Manual at all times
Stand the 350G XL Tripod up
and make sure the base plates
are flat on the ground.
Loosen the red turn knobs on the
cross links of each tripod leg to
extend the legs.
One at a time, slowly push down
on the red turn knobs while pulling
the leg out to extend it.
Push the cross links all the way
down and tighten the red turn
knobs to secure them.
Loosen the turn knobs on the two
tripod legs adjacent to the winch.
Extend the two tripod legs
adjacent to the winch.
DO NOT
extend the tilt leg at this time.
Locate the stake bag with
hammer and tripod stakes.
At a slight angle, drive a stake into
the left hole on each of the two
extend tripod leg base plates.
DO NOT
stake the holes on the
right side at this time.
Locate the mounting pole. It’s the
only pole without a gold insert.
Release the cam lock on the
bottom of the tripod.
Insert the mounting pole until one
hole is showing below the cam
lock and
Lock the Cam Lock
.
Locate the Red Primary Guy Ring
in the guying bag.
Pull the pin out and slide it onto
the mounting pole.
DO NOT
secure it at this time.
Mount your equipment to the
mounting pole and secure all
cables using Velcro Straps.
Push the tripod upright, extend
the tilt leg and tighten the red turn
knob.
Make sure the base plates on the
three tripod legs are flat on the
ground.
Using the three bubble levels,
level the tripod by adjusting the
tripod legs one at a time.
At a slight angle, drive stakes in
opposite directions into the re-
maining holes on the base plates.
Locate the Lift Base Plate.