Do Not Duplicate, Alter, or Copy without the Express Written Consent
of BlueSky Mast, Inc. Copyright 2019 Allendale LLC All Rights Reserved
350G XL
-
Lift Series
Quick Reference Sheet
-
Primary Guying Only
DEPLOYMENT
Read Manual Before Use
Refer to detailed instructions in the
350G XL Lift Series Manual at all times
Insert the lift base plate into the
bottom of the mounting pole.
Locate the winch handle.
Pull the pin on the winch and
insert the handle. Release the pin
to secure the handle.
Pay out the cable by turning the
winch handle counter clockwise.
The cable should hang freely on
the left side of the winch and
should not go over anything.
Pass the cable through the two
rollers on the Lift Base Plate and
back up to the ball stop holder.
Pull the pin on the ball stop holder
opposite the winch. Insert the ball
stop and release the pin to secure.
Confirm the cable is taut and the
Lift Base Plate is secure.
Release the cam lock and raise
the mounting pole by turning the
winch clockwise.
Raise the mounting pole until only
one inch is showing below the
cam lock.
Lock the cam lock.
Pin the Red Primary Guy Ring
BELOW
your devices and allow
room for the guy ropes to clear.
Deploy Primary Guying
Four Guy Configuration
TWO PEOPLE
Person #1
Locate the
GUY LEADER
with orange guy rope and clip it
into the
Round Hole
on the primary guy ring. Walk away from the mast
unwinding the guy leader rope until you reach the 10M mark.
Guy Stake #1
- At the 10M mark
drive a stake into the ground at a
slight angle.
Guy Stake #2
- make sure it is
staked directly opposite and inline
with guy stake #1
Repeat this process until all four
primary guy stakes are deployed
90 degrees apart.
1”
26
21
22
23
24
25
27
28
30
31
29
32
33
34
35
36
37
38
39
NOTE: The Meter Markers on the
Guy Leader may vary based on
system height purchased.
Person #2
- Locate the four Large
Guy Stakes and Hammer and
follow behind person #1.