Do Not Duplicate, Alter, or Copy without the Express Written Consent
of BlueSky Mast, Inc. Copyright 2019 Allendale LLC All Rights Reserved
350G XL
-
Lift Series
Quick Reference Sheet
-
Primary Guying Only
Lowering / Recovery
Read Manual Before Use
Refer to detailed instructions in the
350G XL Lift Series Manual at all times
Remove the mast pole.
Raise the lift base plate until it
nests firmly into the next mast
pole.
Repeat this process for the next
couple poles.
Continue lowering the mast until
you reach the primary guy ring.
Remove the primary guy ropes.
Pull in all the slack, wind and stow
the four primary guy ropes.
Pull the pin to release the primary
guy ring.
Use the hammer to tap the guy
stakes side to side and back and
forth to loosen / remove them.
Use the crow bar to remove both
stakes from the tilt leg base plate.
Now remove the single stake on
the right side of each of the re-
maining base plates.
Remove primary guy ring and
stow it with the guy ropes.
Release the ball stop from the
holder and wind up the cable on
the winch.
Remove and stow the lift base
plate.
Release the cam lock and remove
and stow the mounting pole.
Lock the cam lock.
Collapse the two extended tripod
legs.
Remove and stow the winch
handle.
Adjust the four primary guy ropes
and make sure the mast is
straight and perpendicular.
Stow the four guying stakes in the
stake bag.
Remove all devices and accesso-
ries from the mounting pole.
Hold the mounting pole, loosen
the turn knob on the tilt leg and
SLOWLY kneel the tripod.
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38