Installation
8
Oven Assembly
OVEN STACKING
1. Place the upper oven on top of the lower oven.
2. Remove the left and right body sides from
both the top and bottom ovens.
3. Align the holes in the top frame of the bottom
oven with the leg mount holes in the upper
oven.
4. Secure the ovens together using the bolts proĆ
vided.
5. Reinstall the left side panels.
UTILITY CONNECTIONS
NOTE: Refer to Figure 6 for location of utility conĆ
nection on the back of the ovens.
Water
Manifold
Drains
Utility
Box
Cavity
Vents
Figure 6
Electrical
1. Remove the two screws from above and beĆ
low the control panel. Slide the panel out to acĆ
cess the terminal blocks.
Figure 7
2. Connect the power cord to the top unit. Run
the cord down the back of the oven, using the
provided strain relief.
3. Then route the cord under the oven, supportĆ
ing it on the retainer bracket on the rear right
leg. Connect to the top right receptacle on the
utility box at the front of the oven. See
Figure 8.
4. Connect the power cord to the bottom unit.
Run the cord down the back of the oven, using
the provided strain relief.
5. Then route the cord under the oven, supportĆ
ing it on the retainer bracket on the rear right
leg. Connect to the bottom right receptacle on
the utility box at the front of the oven. See
Figure 8.