Operating instructions SC II
Installation
61429850113 en-US
21 / 107
The preferred value for brightness is set automatically and should be changed in relation to
the lighting conditions.
Contrast of operator display/customer display
The preferred value for contrast is set automatically and should be changed in relation to the
lighting conditions.
4.5
Installation and assembly
Installation, first commissioning, adjustment, initial instruction, maintenance and repair work
may only be performed by our customer service and/or by companies or persons authorized
by us.
4.5.1
Assembling the device
Open packaging, remove accessories and lift the device carefully out of the packaging.
4.5.2
Leveling
To compensate for any small irregularities in the floor space, the scale can be leveled at the
foot screws using a spirit level.
After each change of location, the scale must be re-leveled.
1
Position of spirit level
Illustration 5: Foot screws
2
Foot screws
Turn the foot screws
2
until the air bub-
ble
3
is located in the center of the
spirit level
1
.
Illustration 6: Device is leveled correctly
Illustration 7: Device is not leveled correctly.
4.5.3
Check the electric connection
Power supply
Summary of Contents for SC II 100
Page 99: ...Operating instructions SC II Annexe 61429850113 en US 99 107 10 Annexe...
Page 103: ...Operating instructions SC II Annexe 61429850113 en US 103 107 Illustration 86 WLAN BWLC2...
Page 104: ...Annexe Operating instructions SC II 104 107 61429850113 en US Illustration 87 WLAN BWLC2...
Page 105: ...Operating instructions SC II Annexe 61429850113 en US 105 107 Illustration 88 WLAN BWLC2...