9
pH BOSS INSTALLATION
DRUM WEIGHT HOSE INSTALLATION
1. Remove the lid from the acid drum that you will
use.
2. Drill a 6.5mm or 1/4 inch hole into the top of the
drum lid.
3. Push the end of the drum weight hose through
the drum lid.
4. Fit the hose onto the drum weight tube fitting in
the same way as described in the
Tee Piece Hose
Installation
section above and illustration below.
pH PROBE INSTALLATION
1. Fit Teflon tape onto the thread of the pH Probe. Carefully remove the
protective cap from the tip of the probe.
2. Screw the pH Probe into the Tee piece thread. Tighten firmly by hand. DO
NOT OVER-TIGHTEN. DO NOT USE A TOOL.
3. After the pH Probe is installed in the Tee piece, connect plug on the pH
Probe cable into the probe socket on the pH BOSS. Push the plug into place
and 1/4 turn clockwise to lock it into place. See the pH Probe socket
diagram, Page 4.
AFTER ALL HOSE FITTINGS ARE COMPLETED, AND THE PROBE IS FITTED, TEST
THE SYSTEM WITH FRESH WATER, USING THE MANUAL DOSE FUNCTION
(PAGE 9). CHECK CAREFULLY FOR ANY LEAKS AND CORRECT AS NEEDED.
TEE PIECE HOSE INSTALLATION
1. Remove the nut from the one way valve fitting on
the Tee piece.
2. Slip the Nut over the hose.
3. Push the hose firmly onto the tube fitting.
4. Tighten the nut over the hose. Tighten firmly
with fingers. DO NOT USE A TOOL.