Biodom 27 d. o. o.
T: +386 8 205 10 86
OIC Hrpelje 4 a, 6240 Kozina
F: +386 5 662 67 57
www.biodom27.si
13
Figure 6
1.
T-coupler pipe housing or bent component with inspection hatch
2.
Direction of cleaning
3.
Opening, inspection and service hatch
4.
Direction of cleaning
5.
T-coupler pipe housing – T-coupler or bent component with inspection hatch
6.
Direction of cleaning
7.
Hermetic seal for cleaning
Figure 7: Method of exhaust pipe installation
Insulation thickness in mm
Exhaust pipe diameter (mm)
D.80
D.100
Diameter of opening (hole) (mm)
Wooden
walls
or
flammable
components
100
150
170
Concrete wall or roof
50
100
120
YES
NO
DIRECTION
OF SMOKE