KB (E4 + E6) 02/2017
page 22/148
With an increased amount of dust in the ambient air, clean the condenser fan (by suction or blowing) sev-
eral times a year.
Avoid any conductive dust in the ambiance according to the chamber layout complying with pollution de-
gree 2 (IEC 61010-1).
Do not install or operate the chamber in potentially explosive areas.
DANGER
Explosion hazard.
Danger of death.
∅
Do NOT operate the chamber in potentially explosive areas.
KEEP explosive dust or air-solvent mixtures AWAY from the vicinity of the chamber.
4.
Installation of the equipment
4.1
Spacers for wall distance – KB 240 / 400 / 720 (E6)
Please fix both spacers with the supplied screws at the chamber rear. This serves to ensure the pre-
scribed minimum distance to the wall of 100 mm /
3.94
in
.
Figure 9: Spacer for rear wall distance
Figure 10: Rear KB 240 / 400 / 720 (E6) with mounted spacers
Summary of Contents for KB 115 (E4)
Page 133: ...KB E4 E6 02 2017 page 133 148 23 7 KB 53 dimensions mm...
Page 134: ...KB E4 E6 02 2017 page 134 148 23 8 KB 115 dimensions...
Page 135: ...KB E4 E6 02 2017 page 135 148 23 9 KB 240 dimensions mm...
Page 136: ...KB E4 E6 02 2017 page 136 148 23 10 KB 400 dimensions mm...
Page 137: ...KB E4 E6 02 2017 page 137 148 23 11 KB 720 dimensions...
Page 139: ...KB E4 E6 02 2017 page 139 148...
Page 141: ...KB E4 E6 02 2017 page 141 148...
Page 142: ...KB E4 E6 02 2017 page 142 148 25 Product registration...
Page 149: ......