Step 4: Front Frame Assembly
Note: Pre-drill all holes using a 1/8” drill
bit before installing the lag screws.
Hex Bolt Assembly
Lock
Washer
T- Nut
Flat
Washer
He x
Bolt
Predrill Pilot Holes for Lag Screw
Lag
Screw
Flat
Washer
Predrill 1/8”
pilot hole
Use factory drilled
hole as a guide
Fig. 4.1
Notice hole
location towards
bottom
F12
LS3
H6
F9
S7
S7
LS3
H6
1 x
Front Back 1 x 5 x 46-5/8”
1 x
Floor Front 2 x 3 x 46-1/4”
F9
F12
Hardware
Wood Parts
2 x
1/4 x 4-3/4” Hex Bolt
(1/4” lock washer, 1/4” flat washer, 1/4” t-nut)
2 x
1/4 x 3” Lag Screw
(1/4” flat washer)
2 x
#12 x 2” Pan Screw (with 3/16” flat washer)
H6
LS3
S7
F13
F13
A:
Attach (F12) Floor Front to both (F13) Posts using 2 (H6) 1/4 x 4-3/4” Hex Bolts (with lock washer, flat washer
and t-nut). (fig. 4.1)
B:
Square and attach 1 (F9) Front Back to the bottom of (F13) Posts with 2 (LS3) 1/4 x 3” Lag Screws (with flat
washer) in the top (pre-drilled) hole and 2 (S7) #12 x 2” Pan Screws (with 3/16” flat washer) in the bottom holes
as shown in (fig. 4.1).
C:
Tighten all bolts.
Note: Some
boards removed
for clarity
14
Summary of Contents for ORIANA A24656E
Page 2: ......
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ...Square Assembly...
Page 36: ...NOTES 36...
Page 37: ...NOTES 37...
Page 38: ...NOTES 38...
Page 39: ...NOTES 39...