Step 20: Attach Ground Stakes
A:
Drive 1 (OR15) Ground Stake 10-1/2” into the ground at each (F13) Post shown in fig. 20.1 and attach with 2
(S3) #8 x 2-1/2” Wood Screws per ground stake.
MOVE FORT TO FINAL LOCATION. FINAL LOCATION MUST BE LEVEL GROUND
Warning! To prevent tipping and avoid potential injury,
stakes must be driven 10-1/2” into ground. Digging or
driving stakes can be dangerous if you do not check
first for underground wiring, cables or gas lines.
10-1/2”
Fig. 20.1
OR15
F13
S3
Hardware
6 x
#8 x 2-1/2 Wood Screw
S3
3 x
Ground Stakes 1-1/4 x 1-1/2 x 14”
OR15
Wood Parts
F13
F13
OR15
OR15
34
Summary of Contents for ORIANA A24656E
Page 2: ......
Page 3: ......
Page 4: ......
Page 5: ......
Page 6: ...Square Assembly...
Page 36: ...NOTES 36...
Page 37: ...NOTES 37...
Page 38: ...NOTES 38...
Page 39: ...NOTES 39...