- 65 -
INST
ALLA
TION
COMMISSIONING
Setting record
7.18
Important: at the end of the setting op-
eration it is important to fi ll/update the
table ( Fig. 7.45 ).
This to allow a correct setting of this
boiler in case of replacement of the main
control p.c.b.
PARAMETER
DIGIT
VALUES
Boiler type (to be
updated with the
complete range)
Pr 01
Not used
Pr 02
---------------
Not used
Pr 03
---------------
Not used
Pr 04
---------------
Gas type
Pr 05
Not used
Pr 06
---------------
C.h. fl ow max
temperature °C
Pr 07
Factory param-
eters reset
Pr 08
Chimney sweep
function
Pr 09
C.h. reignition
frequency
Pr 10
C.h. pump
post-circulation
Pr 11
Max. useful output
in c.h. mode
Pr 12
C.h. pump working
type
Pr 13
Ignition power
Pr 14
K value (external
probe diagram)
Pr 15
Not used
Pr 16
Not used
Pr 17
---------------
NTC on the c.h.
return
Pr 18
Not used
Pr 19
---------------
Not used
Pr 20
---------------
PARAMETER
DIGIT
VALUES
Not used
Pr 21
---------------
Not used
Pr 22
---------------
Not used
Pr 23
---------------
Not used
Pr 24
---------------
Not used
Pr 25
---------------
Not used
Pr 26
---------------
C.h. minimum
setpoint
Pr 27
Fig. 7.45
Enter the ”programming mode” by press-
•
ing keys 11 - 12 - 13 ( Fig. 7.46 ) for 10 sec-
onds at the same time until the letters
Pr
that alternate with code
01
are displayed
on the LCD display, indicating that ”param-
eter 01”( Fig. 7.47 ) has been activated.
Fig. 7.46
11
12
13
Fig. 7.47